Government
Who: Techworks Electrical
Completed: 2018
Duration: 6 Months
Architectural lighting upgrade to 8 x galleries, concourse areas and common spaces. A total of 2km of track lighting was installed throughout the galleries. Works included an Intelligent lighting control system upgrade, Emergency Lighting and Security system modifications and extensive Switchboard modifications.
This project was delivered in a challenging time frame in preparation for an international exhibition with a total of 9 stages in a live environment.
Images: Lighting Options Australia