Who: Techworks Electrical

Completed: 2018

Duration: 6 Months

Architectural lighting upgrade to 8 x galleries, concourse areas and common spaces. A total of 2km of track lighting was installed throughout the galleries. Works included an Intelligent lighting control system upgrade, Emergency Lighting and Security system modifications and extensive Switchboard modifications.

This project was delivered in a challenging time frame in preparation for an international exhibition with a total of 9 stages in a live environment.

 

Images: Lighting Options Australia

STAY
CONNECTED

9 MUMFORD PLACE,
BALCATTA, WA 6021

PO Box 696,
BALCATTA WA 6914